These first two pictures show the footing and garage floor with #3 Re-Bar placed ready for panels to be erected. |
|
|
|
Mr. Dolan's first panel. This panel is 12 feet tall. |
|
Panels braced after two days work. |
|
This picture shows 4x4 steel posts supporting a glue lam beam. The 4x4 posts will be covered with concrete. |
|
The next two pictures show how the Tri-Di panel can be applied for curved walls. These pictures also show the panels being used as an insulated stem wall for a crawl space. |
|
|
|
The next two pictures show how the crawl space vents are placed in the panel and what they looked like when finished. |
|
|
|
This is the inside of the garage, after 1 1/2" of concrete applied to panel systems. |
 |
Window installation on Tri-Di panel. |
 |
Dolan Residence with roof sheeting. This project scheduled for completion Spring of 2006. More images to come. |