These are 22 foot tall panels. Easily placed with three people creating the daylight basement walls and main floor walls. |
|
22 Foot tall panels with bond-beam pocket created and bracing. |
|
View of daylight basement and first floor walls. |
|
Rough openings for windows. These openings were cut and the panel was removed after walls were put in place. |
|
Finished window rough opening with re-enforcement mesh and re-bar. |
|
Daylight basement with concrete being applied. |
|
Structure with concrete applied prior to trusses. |
|
Detached garage walls prior to trusses. |
|
Structure with roof sheeting. |
|
Detached shop awaiting stucco coating. This home scheduled for completion Spring of 2006. More images to come. |