Spencer Residence

These are 22 foot tall panels. Easily placed with three people creating the daylight basement walls and main floor walls.

22 Foot tall panels with bond-beam pocket created and bracing.

View of daylight basement and first floor walls.

Rough openings for windows. These openings were cut and the panel was removed after walls were put in place.

Finished window rough opening with re-enforcement mesh and re-bar.

Daylight basement with concrete being applied.

Structure with concrete applied prior to trusses.

Detached garage walls prior to trusses.

Detached shop awaiting stucco coating. This home scheduled for completion Spring of 2006. More images to come.